How a kitchen install works, step by step

Fitted kitchen illustration

Most homeowners want to know one thing: how long will I be without a kitchen? For an average kitchen, fitting itself takes about 3 to 5 working days, but the whole job runs longer once electrics, plastering and worktop templating are included. Here is how it usually goes.

  1. Planning and design. Measure up, choose a layout and set a budget. Allow roughly 2 to 8 weeks, longer if you are comparing suppliers.
  2. Survey and measure. A fitter or the retailer checks walls, floors, pipes and electrics. Do this before you order, because a wrong measurement is expensive.
  3. Order and wait. Made-to-order kitchens can take 2 to 8 weeks to arrive. Check every box on delivery.
  4. Strip out. The old kitchen comes out, along with old flooring and splashbacks if needed.
  5. First fix. Electrician, plumber and gas engineer run new cables and pipes. Plastering follows if walls were opened up.
  6. Flooring. Fit hard flooring before units if it will run under them, or after if it only goes in front.
  7. Fit the units. Base units are levelled first, then wall units, then doors and handles.
  8. Worktops. Laminate and wood are cut and fitted on site. Stone and quartz are templated, made off site and fitted a week or two later.
  9. Second fix. Sink, taps, hob, oven, lighting and sockets are connected and tested.
  10. Finishing. Splashbacks, painting, cornice and plinths. The fitter fixes any snags.
  11. Sign-off. Get your electrical certificate and Gas Safe record, plus appliance guarantees.

Tips from the shop floor

See also electrics and gas rules and our cost guide.

Get a free quote

Ready for a free quote?

Tell us about your kitchen and a trusted local installer will get back to you.

Get a free quote Call 07000000000
Call now